Dairy Lagoon Project

Goal:

In New Zealand, an accumulation of scum and odor was caused by factory waste from a 350 cow herd milked over 265 days. The aim of the trial was to demonstrate the reduction of TSS, VSS, TKN, (NHȝ, NOᴤ, NOȝ), BOD, COD, odour control and to liquefy solids. This dairy lagoon was in operation for 6 years without being de-sludged.

Dairy Lagoon Remediation - Global Solutions - pic1

Results:

Dairy Lagoon Remediation - Global Solutions - pic3

With the use of Nature’sBio®, a reduction of TSS, VSS, BOD and COD was confirmed, and the odor was reduced significantly. However, TKN, ammonium TP and DRP only had a slight reduction indicating a high nutrient value for plants.  

It was recommended that the treated effluent be sprayed onto surrounding pastures to enhance the nutrients made available to plants.

Edible Oils Project

Goal:

Treatment to concrete floors of a disused edible oil processing plant after attempting to be cleaned up using chemical solutions that were unsuccessful. 

The crust of Resins that had accumulated were ~ 0.5-2.5 cm thick and did not budge when it was attempted to be removed.

Edible Oil Resin Remediation - Global Solutions - pic1

Results:

Edible Oil Resin Remediation - Global Solutions - pic4

Utilized Nature’sBio® to flood the area to provide the micro-organisms with ideal conditions for biodegradation to occur. The biological solution was able to successfully release the resin from the concrete, allowing removal and disposal.

HUMAN WASTE TRIAL

Goal:

In New Zealand, this multiple pond location had been operating since the late 1890’s as a dump site for raw human effluent. 

To reduce the amount of time for solids to accumulate and flow into a total of 14 ponds including 3 final sand/gravel soak ponds (currently 3 weeks).

Human Waste Water Trial Remediation - Global Solutions - pic1

Results:

Human Waste Water Trial Remediation - Global Solutions - pic3

After treatment with Nature’sBio®, it took 4 months for the first pond to fill with enough solids for removal and the treated solids continued to biodegrade, totaling an 85% reduction in labor and handling costs. Also, the quality of the liquid from ponds 4, 5, 6. 7, 8 and 9 was much clearer with no evidence of accumulated fats. Also, liquid was more quickly dispersed from the final soak ponds.

Oil Interceptor Pit

Goal:

To remove substantial build up of contaminated solids on walls and floor surfaces inside a major distribution terminal.

The international oil company that owned the site gave the requirements of minimal cost and disruptions to the existing operations, as well as the need to prolong the longevity of the interceptor and for the solution to be insitu.

Oil Interceptor Pit Remediation - Global Solutions

Results:

Nature’sBio® demonstrated the degradation process of the hydrocarbon-contaminated material was significantly enhanced, and given time, levels of non-detectability were achieved.

 

After observation and analysis of this degradation process, it was determined that the straight chains were degraded first, followed by the branch chains. Lastly, the complex cyclic chains degraded.

Piggery Field Trial

Goal:

To reduce smell, crust formation and effluent from 3,500 to 4,000 pigs in a four pond effluent system.
Piggery Field Trial -- Global Solutions

Results:

Piggery Field Trial pic 2 -- Global Solutions

After treatment with Nature’sBio® which included oxygenation and adding moisture (surface misting) there was no crust formation, a significant decrease in solids on the bottom and resulted in a 80-90% reduction in ponds’ smell.

Toxic Contaminated Soil Project

Goal:

Bioremediation for DDT contaminated soil.

Toxic Contaminated Soil pic 1 -- Global Solutions

Results:

Toxic Contaminated Soil pic 3 -- Global Solutions

Nature’sBio® was effective in reducing toxicity levels of DDT, DDE and DDE.

Transformer Oil Project

Goal:

To reduce transformer oils (which had leaked from faulty drums and storage tanks onto floors to a depth of 3-6 cm in places). The entire area was enclosed by a concrete nib and could not escape into stormwater drains.

Transformer Oil Project pic 1 -- Global Solutions

Results:

Transformer Oil Project pic 3 -- Global Solutions

After treatment with Nature’sBio, the hydrocarbon levels were reduced, which allowed the liquid to be discharged into a sump. Lab testing confirmed that the transformer oils very quickly biodegraded. The clay granules refurbishing catalyst (treated with the biological solution) were cleaned and the oil was biodegraded as well.

Dairy Factory Effluent

Goal:

Treatment of Nature’sBio® to remediate and reduce effluent in Fat Trap Pit located in New Zealand. 

Dairy Factory Effluent day 1 - Global Solutions

Results:

Dairy Factory Effluent 14 days pic - Global Solutions

After 14 days of treatment with the Nature’sBio® solution, effluent was signifcantly reduced.

Projects

Dairy Lagoon Project

Aim:

To demonstrate the reduction of TSS, VSS, TKN, (NHȝ, NOᴤ, NO₁, NOȝ), BOD, DOC, TO4). In operation for 6 years without being de-sludged, an accumulation of scum and odor was caused by factory waste from 350 cow herd milked over 265 days.
Dairy Lagoon Remediation - Global Solutions - pic1

Results:

Dairy Lagoon Remediation - Global Solutions - pic3
With the use of nature’sBio®, a reduction of TSS, VSS, BOD and COD was confirmed, and the odor was less. It was recommended that the high nutrient value of remaining TKN, ammonium, TP and DRP be sprayed onto pastures to enhance the nutrients made available to plants.

Edible Oils Project

Aim:

To remove a disused edible oil from concrete floors at a processing plant. Resins had accumulated on the floor in approximately .5-2.5 cm in thickness.

Edible Oil Resin Remediation - Global Solutions - pic1

Results:

Edible Oil Resin Remediation - Global Solutions - pic4

nature’sbio® successfully released the resin from the concrete, allowing its removal and disposal. 

Human Waste Trial

Aim:

To reduce the amount of time for solids to accumulate and flow into a total of 14 ponds including 3 final sand/gravel soak ponds (currently 3 weeks).
Human Waste Water Trial Remediation - Global Solutions - pic1

Results:

Human Waste Water Trial Remediation - Global Solutions - pic3
After treatment with nature’sBio®, it took 4 months for the first pond to fill with enough solids for removal and the treated solids continued to biodegrade, totaling an 85% reduction in labor and handling costs. Also, the quality of the liquid from ponds 4, 5, 6. 7, 8 and 9 was much clearer with no evidence of accumulated fats. Also, liquid was more quickly dispersed from the final soak ponds.

Oil Interceptor Pit

Aim:

To remove substantial build up of contaminated solids on walls and floor surfaces.
Oil Interceptor Pit Remediation - Global Solutions

Results:

nature’sBio®  demonstrated the degradation process of the hydrocarbon-contaminated material was significantly enhanced, and given time, levels of non-detectability would have been achieved.

Piggery Field Trial

Aim:

To reduce smell, crust formation and effluent from 3,500 to 4,000 pigs in a four pond effluent system.
Piggery Field Trial -- Global Solutions

Results:

Piggery Field Trial pic 2 -- Global Solutions
After treatment with nature’sBio® which included oxygenation and adding moisture (surface misting) there was no crust formation, a significant decrease in solids on the bottom and resulted in a 80-90% reduction in ponds’ smell.

Toxic Contaminated Soil

Aim:

Bioremediation for DDT contaminated soil.

Toxic Contaminated Soil pic 1 -- Global Solutions

Results:

Toxic Contaminated Soil pic 3 -- Global Solutions
nature’sBio® was effective in reducing toxicity levels of DDT, DDE and DDE.

Transformer Oil Project

Aim:

To reduce transformer oils (which had leaked from faulty drums and storage tanks onto floors to a depth of 3-6 cm in places). The entire area was enclosed by a concrete nib and could not escape into stormwater drains.

Transformer Oil Project pic 1 -- Global Solutions

Results:

Transformer Oil Project pic 3 -- Global Solutions

After treatment with nature’sBio, the hydrocarbon levels were reduced, which allowed the liquid to be discharged into a sump. Lab testing confirmed that the transformer oils very quickly biodegraded. The clay granules refurbishing catalyst (treated with the biological solution) were cleaned and the oil was biodegraded as well.

Dairy Factory Effluent

Aim:

Treatment of fat trap; to remediate and reduce effluent.
Dairy Factory Effluent day 1 - Global Solutions

Results:

Dairy Factory Effluent 14 days pic - Global Solutions

After 14 days of treatment with the nature’sBio® solution, effluent was signifcantly reduced.